Begining a Permenant Wood Foundation.

Getting organized

More materials

Permenant Wood Foundations go up fast.

Installed Waterproofing.

Multi-layered protection.

A typical floor system.

Winter came fast but the show must go on.

Walls are up and trusses being added.

Trusses complete, ready for subfascia.

Roof complete, it can stop snowing now! (it did)

A "Fun Room"

Mini Kitchen.

Mini Kitchen extends to BBQ.

Wood fired BBQ.

A typical new home.

A wooded setting.

Ranch style can be personalized.

Spiral Log Staircase.

A typical "Corner Scribed" log home.

Nearing completion.

Milled "Square Log" home.

Dovetailed corners.

Ready for roofing.

ICF's (Insulated Concrete Forms) being poured.

Typical bracing.

Done pouring.

Finished house on ICF foundation.

Beginning Timber Frame erection.

About half done with timbers.

Timbers done and installing SIP's (Structural Insulated Panels).

SIP's nearing completion.

Framing and roofong done.

Finished Timber Frame Home.

We apologize that some of our photos appear in more than one gallery. Due to circumstances beyond our control we have had difficulty retrieving all of our photos. We have, however, been able to put together a fairly good cross section of our work. Of course, after 20 years of construction, these photos are only a small portion of what we have. We will add and update as more photos become available. Check back often as this site is still under construction.

 